Home Contact Us Site Map

 

Specifications

Project Info
Specifications
Stilt Floor Plan
Typical Floor Plan
Location Map

STRUCTURE
RCC framed structure with
a) External and Internal walls of solid concrete blocks/table moulded blocks
b) Internal Walls: Cement plaster with putty finish
External Walls: Cement plaster

LOBBY & STAIRCASE
Main entrance lobby will be done in a combination of granite and textured paint. Vitrified tiles and textured paint for the upper floor lobbies.

LIFT
Two passenger elevators of suitable capacity and one service elevator will be provided in each block. Separate elevators to the Sky Club are
provided.

FLOORING
- Vitrified tiles flooring in living, dining, kitchen and in all bedrooms.
- Ceramic tiles in toilets

DOORS
Internal Doors : Unit Entrance Door - Wood frames and paneled door with fittings.
Other Internal Doors - Wood frame with flush shutter and fittings.

WINDOWS/VENTILATORS
UPVC framework with glass for living/dining, bedrooms, kitchen and toilets.

TELEPHONE
Telephone points in living/dining room and in all bedrooms.
WALL FINISHES
Internal Walls: Oil bound distemper for all plastered walls and ceilings
External Walls: Textured paint for the exteriors and common areas.

KITCHEN
Polished granite platform with stainless steal sink and drain board with single lever sink mixer. Ceramic tile dado of 2 feet above granite counter.

TOILETS
Ceramic tiles for flooring and dado up to false ceiling, EWCs, natural marble vanity top with semi recessed wash basin and single level mixer taps,
chromium plated fittings, geysers, bathtub will be provided in master toilet.

ELECTRICAL
Concealed conduits with copper wires and suitable points for Power and Lighting. Provision for split ACs/ledge in the living area and all bedrooms.  Wiring for cable TV will be done.
- 7KVA power for the regular units
- 12KVA power for the duplexes
- 20 KVA power for the triplexes

TELEVISION
Television points in living room and in all bedrooms.

GENERATOR
Generator will be provided for all common services. In addition, 100% backup will be provided at additional costs (operating cost to be borne by
the client)